Product Details
Place of Origin: Jiangsu, China
Brand Name: SHENHONG
Certification: ISO
Model Number: JJM3-C
Payment & Shipping Terms
Minimum Order Quantity: 2 sets
Price: negotiation
Packaging Details: standard export wooden case
Delivery Time: 7 days after payment
Supply Ability: 500 set/sets per month
Motor: |
Diesel Engine |
Capacity: |
30KN |
Type: |
Powered Winch |
Rated Load: |
4HP |
Weight: |
100kg |
Size: |
840×600×500 |
Motor: |
Diesel Engine |
Capacity: |
30KN |
Type: |
Powered Winch |
Rated Load: |
4HP |
Weight: |
100kg |
Size: |
840×600×500 |
4HP Rated Load Portable Diesel Cable Winch For Transmission Line Laying Projects
Introduction
The hoist another name is winch. Vertical lifting transport machinery is an important component of the tie in with the , mast, pulley blocks, and auxiliary equipment, used to enhance the materials, installation of equipment operations, from human or mechanical power-driven drum, winding traction rope to complete the installation work. Vertical, horizontal or inclined simple tractor Lifting heavy objects. Two types of the hoist are manual and electric two kinds. The design of the 3-ton electric hoist motor contions electromotor ,coupling,arrester,retarder,drum,boom sheave ,a system of pulleys set,hook, etc..
Application
Powered winches are the construction tools of erecting electric circuits of high pressure electric transmission in the sky and laying electrical cables underground. They can complete the tasks of heavy-lifting and dragging such as erecting the wire. Testified by the experiments and practical uses, they have reasonable structure, small volume, light weight, strong power, nimble operation and convient transporting. Based on so many advantages, this Powered winch is popular with the electric workers.
Features
1. Reasonable structure
2. Small volume
3. Light weight
4. Strong power
5. Nimble operation
6. Convenient transporting
Operation methods
1. Before turning on the machine, you must turn on the clutch first and put the racker for crosspiece - changing in the zero position.
2. When moving the crosspiece, you should be quick. Otherwise the brake won’t work well. When turning on the machine, you shouldn’t work too fiercely.
3. When changing the crosspiece position, you must turn on the clutch. Otherwise the gear will be damaged. After that, you should check whether the changing job is well done. Make sure you haven’t changed two crosspieces in one time.
4. If there is any difficulty during the process of changing crosspiece position, you shouldn’t try to complete the job forcefully. Instead you should use the hand installment to help you complete the job. Concrete procedure: using the spanner to move the hand installment to a position with a certain angle, then you can change the crosspiece position smoothly.
Technical Data
Model Type | Engine Power | Gear | Pulling Speed(m/min) | Line Pull(Ton) |
JJM3-C | Diesel Engine | Slow | 5 | 3 |
Quick | 12 | 1.8 | ||
Reverse | 4.5 |
Quality Control
We have the complete production equipments and professional production team to manage the whole process from producing to packing and shipping.All of the products will be 100% tested before the delivery to ensure the quality of our products.
Our Values
1. Take First-Class Quality as Target and First-class Service.
2. As Responsibility, To Succeed By Scientific Management.
3. Customer in Heart, Quality in Hand, Technology in the Lead.